SKU: # 110933031

Flowline SE Helmet W/MIPS Radian Burgundy / Charcoal

$159.99
+ LOYALTY MEMBERS receive 799 Points

New
MIPS
SKU: # 110933031

Flowline SE Helmet W/MIPS Radian Burgundy / Charcoal

$159.99
+ LOYALTY MEMBERS receive 799 Points

  • Flowline SE Helmet W/MIPS Radian Burgundy / Charcoal
  • Flowline SE Helmet W/MIPS Radian Charcoal / Red
  • Flowline SE Helmet W/MIPS Radian Flo Yellow
  • Flowline SE Helmet W/MIPS Radian Gray / Charcoal
  • Flowline SE Helmet W/MIPS Radian Navy / Titanium
  • Flowline SE Helmet W/MIPS Radian Orange / Dark Gray
  • XS/SM
  • MD/LG
  • XL/2X

Expected to Ship On

Qty
Sold Out

Details

The all-new Flowline SE Helmet is handpicked, literally, by the pros and for good reason. The Flowline SE Helmet features all the same marquee accolades as the Flowline Helmet including an NTA 8776 E-Bike Certification and Virginia Tech 5-Star Safety rating but with upgrades. Premium details like a fidlock® magnetic buckle, Anti-Microbial Quick Dry comfort liner, dual density EPS and more make Flowline SE the premium choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

Features
Adjusters
Side strap adjusters 
Features
Dual EPS
Dual Density EPS for low and high-speed impacts
Features
E-Bike
NTA-8776 certified for E-Bike usage
Features
Fidlock
Fidlock® Magnetic Buckle System
Features
Liner
Anti-microbial Quick Dry Premium Liner
Features
MIPS
MIPS B-Series Rotational Impact Brain Protection System
Features
Retention System
Full 360-degree fit retention system with 3-way rear height adjustment 
Features
Safety
5-Star Virginia Tech safety rating
Features
Ventilation
14 vents for maximum airflow 
Features
Visor
3-Way adjustable screwless visor
how to fit helmets section
How to Fit
Measure Your Head
With a fabric tape measure around the circumference of your head holding the tape just above your eyebrows and ears. 1” = 25mm

Specifications

Specifications

Specification Image

Specifications

  • 3-Way adjustable screwless visor
  • NTA-8776 certified for E-Bike usage
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow 
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Fidlock® Magnetic Buckle System
  • Dual Density EPS for low and high-speed impacts
  • Anti-microbial Quick Dry Premium Liner
  • Side strap adjusters 
  • 5-Star Virginia Tech safety rating

Follow us on Instagram

Reviews

Flowline SE Helmet W/MIPS Radian Burgundy / Charcoal
Flowline SE Helmet W/MIPS Radian Burgundy / Charcoal
Flowline SE Helmet W/MIPS Radian Burgundy / Charcoal
Flowline SE Helmet W/MIPS Radian Burgundy / Charcoal
Flowline SE Helmet W/MIPS Radian Burgundy / Charcoal