SKU: # 108959081

Flowline Helmet W/MIPS Orbit Apple

Regular price $119.00 $71.40
+ LOYALTY MEMBERS receive 357 Points

Sale
MIPS
E-Cert
SKU: # 108959081

Flowline Helmet W/MIPS Orbit Apple

Regular price $119.00 $71.40
+ LOYALTY MEMBERS receive 357 Points

  • Flowline Helmet W/MIPS Orbit Apple
  • Flowline Helmet W/MIPS Orbit Black
  • Flowline Helmet W/MIPS Orbit Cinnamon
  • Flowline Helmet W/MIPS Orbit Dk Blue
  • Flowline Helmet W/MIPS Orbit Forest Green
  • Flowline Helmet W/MIPS Orbit Gold / Black
  • Flowline Helmet W/MIPS Orbit Gray
  • Flowline Helmet W/MIPS Orbit Magenta / Black
  • Flowline Helmet W/MIPS Orbit Mirage Blue
  • Flowline Helmet W/MIPS Orbit Oasis Blue / Black
  • Flowline Helmet W/MIPS Orbit White
  • XS/SM
  • MD/LG
  • XL/2X
Customize

Lettering + $150 will be added to cart

Expected to Ship On

Qty
Sold Out

Details

Unassuming Style x Undercover Performance

Don’t let its casual looks fool you. Flowline quietly intertwines TLD’s dependable helmet protection and comfort features with an affordable price point. Beneath its clean, understated hood, TLD leans on years of helmet technology experience to crank up the performance, earning a Five-Star safety rating from Virginia Tech.

Features
Strap Adjustment
Side strap adjusters 
Features
E-Bike
NTA-8776 certified for E-Bike usage
Features
MIPS
MIPS B-Series Rotational Impact Brain Protection System
Features
Retention System
Full 360-degree fit retention system with 3-way rear height adjustment 
Features
Safety
5-Star Virginia Tech safety rating
Features
Ventilation
14 vents for maximum airflow 
Features
Visor
3-Way adjustable screwless visor
how to fit helmets section
How to Fit
Measure Your Head
With a fabric tape measure around the circumference of your head holding the tape just above your eyebrows and ears. 1” = 25mm

Specifications

Specifications

Specification Image

Specifications

  • 3-Way adjustable screwless visor
  • NTA-8776 certified for E-Bike usage
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment 
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Side strap adjusters 
  • 5-Star Virginia Tech safety rating

Reviews

Flowline Helmet W/MIPS Orbit Apple
Flowline Helmet W/MIPS Orbit Apple
Flowline Helmet W/MIPS Orbit Apple
Flowline Helmet W/MIPS Orbit Apple
Flowline Helmet W/MIPS Orbit Apple

Helmet Lettering

Hand Painted Title

Custom Lettering - $150.00

Helmet Lettering
Hand Painted Lifestyle

Name here is shown digitally as an example. Your hand lettered helmet will be custom and look much cooler.

Hand Painted Signature

Helmet Lettering

Hand Painted Title

Custom Lettering - $150.00

Font:
Color: Colors by: 1 Shot
If you want customized paint options such as race #, gold leaf, etc, please contact our paint department at paint@troyleedesigns.com

Please review your order carefully.

  • Name

  • Font

    Block

    Script

  • Color

Unfortunately we can't offer refunds on customer spelling errors. Please allow an additional 7-10 business days for your custom lettering to be processed. Please note, obscene and offensive language is not allowed.

If you want customized paint options such as race #, gold leaf, etc, please contact our paint department at paint@troyleedesigns.com

Name here is shown digitally as an example. Your hand lettered helmet will be custom and look much cooler.

Hand Painted Signature