sale
This helmet is Mips Rated

Flowline SE Helmet Radian Orange / Dark Gray

Flowline SE Helmet Radian Orange / Dark Gray

Regular price $95.99 USD
Regular price $159.99 USD Sale price $95.99 USD
No returns on sale items. Exchange for store credit only.
Mips® equipped and eMTB-rated, Flowline SE sets the standard for safety within a modern, minimalist design. With 14 vents, an anti-microbial liner, and a Fidlock® magnetic buckl...
Customize (Optional)

Lettering + $150 will be added to cart

Color
  • Flowline SE Helmet Radian Flo Yellow
  • Flowline SE Helmet Radian Orange / Dark Gray
Size
Email when available

The Trail Rider’s Workhorse

SKU:110933041

Specifications

- 3-Way adjustable screwless visor

- NTA-8776 certified for E-Bike usage

- MIPS B-Series Rotational Impact Brain Protection System

- Full 360-degree fit retention system with 3-way rear height adjustment

- 14 vents for maximum airflow

- Full wrap in-mold construction

- Extended Coverage MTB Trail Helmet

- Fidlock® Magnetic Buckle System

- Dual Density EPS for low and high-speed impacts

- Anti-microbial Quick Dry Premium Liner

- Side strap adjusters

Shipping & Returns

FREE Shipping on all orders over $99. For full details, visit our Shipping & Returns Page.

View full details

Helmet Lettering

Hand Painted Title

Custom Lettering - $150.00

Helmet Lettering
Hand Painted Lifestyle

Name here is shown digitally as an example. Your hand lettered helmet will be custom and look much cooler.

Hand Painted Signature

Helmet Lettering

Hand Painted Title

Custom Lettering - $150.00

Font:
Color: Colors by: 1 Shot
If you want customized paint options such as race #, gold leaf, etc, please contact our paint department at paint@troyleedesigns.com

Please review your order carefully.

  • Text

  • Font

    Block

    Script

  • Color

Unfortunately we can't offer refunds on customer spelling errors. Please allow an additional 7-10 business days for your custom lettering to be processed. Please note, obscene and offensive language is not allowed.

If you want customized paint options such as race #, gold leaf, etc, please contact our paint department at paint@troyleedesigns.com

Name here is shown digitally as an example. Your hand lettered helmet will be custom and look much cooler.

Hand Painted Signature

Overall rating: 4.9333334 / 5 from 15 reviews.

AI Generated Review Summary

Summary topics

  • (55%%): Many customers remarked that the fit of the product is great, perfect, and fits well.
  • (17%%): Many customers remarked that the product looks great and has a good fit, which is a common opinion.
  • (13%%): Customers keep praising the awesome color of the product, with no negative reviews mentioned mentioned.

Review topics: [fit, color, clasp, helmet].

Review highlights

  • "fits good and it looks good with my glasses." — James C.
  • "Love the fit and looks of all the TLD helmets." — Joe B.
  • "Great value, good looking fit well." — Jim C.

Reviews

"Most comfottabke helmet ive ever worn. Big fan and wont be switching back to my old brand."

— Tyler (5/5)

Nice

"Nice"

— Luke J. (5/5)

Excellent fit and airflow

"This is a light, comfortable helmet that fits very well. I am absolutely blown away by the airflow through this helmet. It's a bit brighter in color than I expected, but that's ok. Should help visibility when I wear it on the roads."

— Joseph S. (5/5)

Thanks! for the replacement helmet.

"Thanks! for the replacement helmet. The first one was badly damaged. Your staff was excellent!!"

— Steve J. (5/5)

It is some cool beans

"It is some cool beans that I got this helmet on the double it’s a winner winner chicken fried"

— Michael f. (5/5)

MTB Helmet

"Product was shipped quickly. Helmet is awesome!"

— Bobby P. (5/5)

Great Helmet

"Great looking helmet and fits well"

— Diane H. (5/5)

It's orange

"Bought this as a birthday gift for my wife, whose favorite color is orange. She has an A1, which she loves and an A2 that she's never really gotten comfortable in, but she loved the fit of this one, and really liked the magnetic buckle system. Also, the straps are a little easier to adjust front to back fitment than the A1/A2"

— Shannon C. (4/5)

Love It

"Most comfortable helmet I’ve had! Love the custom “TJ” lettering! Thanks TLD!"

— Terry J. (5/5)

Flowline SE Helmet

"We love the new Flowline SE Helmet for it's light weight and the ability to connect or disconnect the straps with a single hand! Genius!"

— Tim T. (5/5)

Q&A

whats the weight of xl helmet?
this helmet approx. weighs 390 grams