Flowline Superlyte Short Mono Timber

Flowline Superlyte Short Mono Timber

Regular price $63.00 USD
Regular price $105.00 USD Sale price $63.00 USD
Sometimes a laid-back attitude is the best approach. The Flowline Superlyte short keeps it calm and balanced with a casual vibe and a 4-way stretch, moisture-wicking, recycled m...
Color
  • Flowline Superlyte Short Mono Timber
  • Flowline Superlyte Short Mono Steel Blue
Size
Email when available

SKU:368472053

Specifications

• 89% Recycled Poly 11% Spandex, 4-way stretch
• Moisture wicking and quick dry interior dobby finish.
• Bluesign® approved fabrics
• Premium custom jacquard elastic waistband
• 20 3/4" out seam. Falls at middle of knee
• 2 front casual pockets with bonded interior construction
• Side pocket for secure mobile storage
• Locking YKK zipper at fly with lightweight snaps

Shipping & Returns

FREE Shipping on all orders over $99. For full details, visit our Shipping & Returns Page.

View full details

Overall rating: 4.5882354 / 5 from 17 reviews.

AI Generated Review Summary

Summary topics

Review topics: ["pockets","shorts","price"].

Review highlights

Reviews

flowline superlytle

"Love these bike shorts. I like bib liners. another brand I've used wouldn't stay in place always moved around. These stay, don;t move down. I bikepack and these shorts are great."

— Michael C. (5/5)

love em nice and lite

"great shorts for the heat super light and the pockets area actually accesible and not too tight"

— robin b. (4/5)

Flowline short

"Would like to see waist adjustment tabs inside short to get better fit with short."

— Chris H. (4/5)

"Super comfortable, nice style and good price!"

— Pablo (5/5)

"Great shorts run a small"

— Joilson (5/5)

Nice Shorts

"I will be trying some other Troy Lee gear in the future."

— Brian K. (5/5)

Great shorts, but ....

"These shorts are great. Lightweight, improved zipper and button enclosure, but the left pocket has a hole in them already and my car keys fell out during my first ride. I need to return them."

— Doug N. (3/5)

Flowline Shorts

"Super comfortable! They fit great and work well for riding"

— Adam F. (5/5)

MTB Shorts

"Great gear at a good price."

— Keith G. (5/5)

Flowline shorts

"Love them! Fit great and pockets are perfect!"

— Jami H. (5/5)

Q&A